TABLE
OF CONTENTS
Background
Project Organisation
Construction Works undertaken during the Reporting Quarter
2.**** SUMMARY OF EM&A REQUIREMENTS
Monitoring Parameters and Locations
Monitoring Methodology and Calibration Details
Environmental Quality Performance Limits (Action and Limit Levels)
Environmental Mitigation Measures
Monitoring Locations
Air Quality
Noise*
Implementation Status of Environmental Mitigation Measures
Status of Environmental Licensing and Permitting
Advice on Solid and Liquid Waste Management Status
5.**** LANDSCAPE AND VISUAL AUDIT
Landscape and visual
Summary of Exceedance
7.**** ENVIRONMENTAL COMPLAINTS
Complaint Log
Complaint Response Procedure
8.**** NOTIFICATION OF SUMMONSES AND SUCCESSFUL PROSECUTIONS
Notification of Summonses
9.**** CONCLUSIONS AND RECOMMENDATIONS
Conclusions
List of
Tables
Table 1.1** Construction Activities from March to May 2006
Table 3.1** Locations of Air & Noise Monitoring
Stations
Table 4.1** Estimated Amounts of Waste Generated from March to May 2006
List of
Figures
Figure 1.1**Project
Organisation
Figure 1.2**Layout of
Work Site
Figure 2.1**Locations
of Air Quality and Noise Monitoring Stations
List of
Appendices
Appendix A*** Contact of Key Environmental Personnel
Appendix B*** Action and Limit Level
Appendix C ***Summary of Environmental Mitigation Implementation Schedule
Appendix D*** Graphical Presentation of Air Quality Monitoring Results
Appendix E*** Graphical Presentation of Noise Monitoring Results
Appendix F****Status of Environmental Licensing and Permitting
Appendix G*** Summary of Complaints
Appendix H*** Complaint Flow Diagram and Complaint Log