COVER

TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

1.**** INTRODUCTION

Background

Project Organisation

Construction Works undertaken during the Reporting Month

2.**** Summary of EM&A Requirements

Monitoring Parameters and Locations

Monitoring Methodology and Calibration Details

Environmental Quality Performance Limits (Action and Limit Levels)

Environmental Mitigation Measures

3.**** MONITORING Results

Monitoring Locations

Air Quality

Noise..

4.**** ENVIRONMENTAL AUDIT

Implementation Status of Environmental Mitigation Measures

Status of Environmental Licensing and Permitting

Advice on Solid and Liquid Waste Management Status

5.**** Landscape and visual audit

Landscape and visual

6.**** NON-compliance (exceedances) of the environmeNtal quality performance limits (action and limit levels)

Summary of Exceedance

Review of the Reasons for the Implications of Non-compliance

7.**** environMental complaints

Complaint Log

Complaint Response Procedure

8.**** Notification of summonses and successful prosecutions

Notification of Summonses

9.**** CONCLUSIONS AND RECOMMENDATIONS

Conclusions

 

 

 

 

List of Tables

 

Table 1.1*****Construction Activities from September to November 2003

Table 3.1*****Locations of Air & Noise Monitoring Stations

Table 3.2*****Summary of Impact Air Quality Monitoring Results for Quarter from September to November 2003

Table 3.3******* ..... Summary of Impact Noise Monitoring Results from September to November 2003

Table 4.1*****Estimated Amounts of Waste Generated from September to November 2003

Table 5.1*****Summary of Number of Exceedances from September to November

 

List of Figures

 

Figure 1.1******Project Organisation

Figure 1.2******Layout of Work Site

Figure 2.1******Locations of Air Quality and Noise Monitoring Stations

 

List of Appendices

 

Appendix A*****Contact of Key Environmental Personnel

Appendix B*****Action and Limit Level

Appendix C **** Summary of Environmental Mitigation Implementation Schedule

Appendix D*****Graphical Presentation of Air Quality Monitoring Results

Appendix E*****Graphical Presentation of Noise Monitoring Results

Appendix F*****Status of Environmental Licensing and Permitting

Appendix G*****Complaint Flow Diagram and Complaint Log