
Background
Project
Organisation
Construction
Works undertaken during the Reporting Month
Summary of
EM&A Requirements
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Results and
Observations
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Results and
Observations
Site
Environmental Audit
Review of
Environmental Monitoring Procedures
Status of
Environmental Licensing and Permitting
Implementation
Status of Environmental Mitigation Measures
Implementation
Status of Environmental Complaint Handling Procedures
Audit
Requirement
Audit
Results
Recommendations,
Corrective Actions and Outstanding Issues
Key Issues
for the Coming Month
Environmental
Monitoring Program for the Next Three Months
Construction
Program for the Next Three Months
7.**** CONCLUSIONS AND
RECOMMENDATIONS
Conclusions
Recommendations
List of Tables
Table 1.1**Construction
Activities in November 2005
Table 2.1**TSP Monitoring
Equipment
Table 2.2**Air Quality
Monitoring Parameters and Frequency
Table 2.3**Locations of Air
Quality Monitoring Stations
Table 2.4**Summary of Impact
Air Quality Monitoring Results for November 2005
Table 3.1**Noise Monitoring
Equipment
Table 3.2**Noise Monitoring Parameters,
Period and Frequency
Table 3.3**Noise Monitoring
Locations
Table 3.4**Summary of Noise
Monitoring Results for November 2005
Table 4.1**Summary of
Environmental Licensing and Permit Status
Table 4.2**Estimated Amounts
of Waste Generated in November 2005
Table 6.1**Tentative Programme
of Construction Works
List of Figures
Figure 1.1**Project Organisation
Figure 1.2**Layout of Work Site
Figure 2.1**Locations of Air Quality and Noise
Monitoring Stations
Figure 2.2**Location of Meteorological Station**
List of Appendices
Appendix
A** Contact of Key Environmental
Personnel
Appendix
B** Action and Limit Level
Appendix
C** Environmental Monitoring Schedule
Appendix
D **Air Quality Monitoring Results
Appendix
E** Summary of Calibration Records
Appendix
F***Noise Monitoring Results
Appendix
G** Summary of Environmental Mitigation
Implementation Schedule
Appendix
H **Event and Action Plan
Appendix
I*** Complaint Flow Diagram and
Complaint Log
Appendix
J***Summary of Complaints