Background
Project Organisation
Construction Works
undertaken during the Reporting Month
Summary of EM&A
Requirements
Monitoring Requirements
Monitoring Equipment
Monitoring Parameters, Frequency
and Duration
Monitoring Locations
Monitoring Methodology
Results and Observations
Monitoring Requirements
Monitoring Equipment
Monitoring Parameters,
Frequency and Duration
Monitoring Locations
Monitoring Methodology
Results and Observations
Site Environmental Audit
Review of Environmental
Monitoring Procedures
Status of Environmental
Licensing and Permitting
Implementation Status of
Environmental Mitigation Measures
Implementation Status of
Environmental Complaint Handling Procedures
Audit Requirement
Audit Results
Recommendations, Corrective
Actions and Outstanding Issues
Key Issues for the Coming
Month
Environmental Monitoring
Program for the Next Three Months
Construction Program for the
Next Three Months
7.**** CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
Table 1.1****Construction Activities in August 2005
Table 2.1****TSP Monitoring Equipment
Table 2.2****Air Quality Monitoring Parameters and
Frequency
Table 2.3****Locations of Air Quality Monitoring
Stations
Table 2.4****Summary of Impact Air Quality Monitoring
Results for August 2005
Table 3.1****Noise Monitoring Equipment
Table 3.2****Noise Monitoring Parameters, Period and
Frequency
Table 3.3****Noise Monitoring Locations
Table 3.4****Summary of Noise Monitoring Results for
August 2005
Table 4.1****Summary of Environmental Licensing and
Permit Status
Table 4.2****Estimated Amounts of Waste Generated in
August 2005
Table 6.1****Tentative Programme of Construction
Works
Figure
1.1***Project Organisation
Figure
1.2***Layout of Work Site
Figure
2.1***Locations of Air Quality and
Noise Monitoring Stations
Figure
2.2***Location of Meteorological
Station
Appendix
A**Contact of Key Environmental
Personnel
Appendix
B**Action and Limit Level
Appendix
C**Environmental Monitoring Schedule
Appendix
D * Air Quality Monitoring Results
Appendix
E**Summary of Calibration Records
Appendix
F**Noise Monitoring Results
Appendix
G**Summary of Environmental Mitigation
Implementation Schedule
Appendix
H * Event and Action Plan
Appendix
I***Complaint Flow Diagram and
Complaint Log
Appendix
J** Summary of Complaints