Background
Project Organisation
Construction Works undertaken during the Reporting Month
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Locations
Monitoring Methodology
Results and Observations
Monitoring Requirements
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Locations
Monitoring Methodology
Results and Observations
Site Environmental Audit
Review of Environmental Monitoring Procedures
Status of Environmental Licensing and Permitting
Implementation Status of Environmental Mitigation Measures
Implementation Status of Environmental Complaint Handling Procedures
Audit Requirement
Audit Results
Recommendations, Corrective Actions and Outstanding Issues
Key Issues for the Coming Month
Environmental Monitoring Program for the Next Three Months
Construction Program for the Next Three Months
7. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
List of
Tables
Table 1.1 Construction
Activities in June 2006
Table
2.1 TSP
Monitoring Equipment
Table
2.2 Air Quality
Monitoring Parameters and Frequency
Table
2.3 Locations
of Air Quality Monitoring Stations
Table
2.4 Summary
of Impact Air Quality Monitoring Results for June 2006
Table
3.1 Noise
Monitoring Equipment
Table
3.2 Noise
Monitoring Parameters, Period and Frequency
Table
3.3 Noise
Monitoring Locations
Table
3.4 Summary
of Noise Monitoring Results for June 2006
Table
4.1 Summary
of Environmental Licensing and Permit Status
Table
4.2 Estimated
Amounts of Waste Generated in June 2006
Table
6.1 Tentative
Programme of Construction Works
List of
Figures
Figure
1.1 Project Organisation
Figure
1.2 Layout of Work Site
Figure
2.1 Locations of Air
Quality and Noise Monitoring Stations
Figure
2.2 Location of
Meteorological Station
List of
Appendices
Appendix A Contact
of Key Environmental Personnel
Appendix B Action
and Limit Level
Appendix C Environmental
Monitoring Schedule
Appendix D Air
Quality Monitoring Results
Appendix E Summary
of Calibration Records
Appendix F Noise
Monitoring Results
Appendix G Summary
of Environmental Mitigation Implementation Schedule
Appendix H Event
and Action Plan
Appendix I Complaint
Flow Diagram and Complaint Log
Appendix J Summary
of Complaints