TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

1.         INTRODUCTION

Background

Project Organisation

Construction Works undertaken during the Reporting Month

Summary of EM&A Requirements

2.         AIR QUALITY MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

3.         NOISE MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

4.         ENVIRONMENTAL AUDIT

Site Environmental Audit

Review of Environmental Monitoring Procedures

Status of Environmental Licensing and Permitting

Implementation Status of Environmental Mitigation Measures

Implementation Status of Environmental Complaint Handling Procedures

5.         LANDSCAPE AND VISUAL

Audit Requirement

Audit Results

Recommendations, Corrective Actions and Outstanding Issues

6.         FUTURE KEY ISSUES

Key Issues for the Coming Month

Environmental Monitoring Program for the Next Three Months

Construction Program for the Next Three Months

7.         CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

 

 

List of Tables

 

Table 1.1       Construction Activities in June 2006

Table 2.1       TSP Monitoring Equipment

Table 2.2       Air Quality Monitoring Parameters and Frequency

Table 2.3       Locations of Air Quality Monitoring Stations

Table 2.4       Summary of Impact Air Quality Monitoring Results for June 2006

Table 3.1       Noise Monitoring Equipment

Table 3.2       Noise Monitoring Parameters, Period and Frequency

Table 3.3       Noise Monitoring Locations

Table 3.4       Summary of Noise Monitoring Results for June 2006

Table 4.1       Summary of Environmental Licensing and Permit Status

Table 4.2       Estimated Amounts of Waste Generated in June 2006

Table 6.1       Tentative Programme of Construction Works

 

 

List of Figures

 

Figure 1.1    Project Organisation

Figure 1.2    Layout of Work Site

Figure 2.1    Locations of Air Quality and Noise Monitoring Stations

Figure 2.2    Location of Meteorological Station    

 

 

List of Appendices

 

Appendix A      Contact of Key Environmental Personnel

Appendix B     Action and Limit Level

Appendix C     Environmental Monitoring Schedule

Appendix D     Air Quality Monitoring Results

Appendix E     Summary of Calibration Records

Appendix F      Noise Monitoring Results

Appendix G     Summary of Environmental Mitigation Implementation Schedule

Appendix H     Event and Action Plan

Appendix I       Complaint Flow Diagram and Complaint Log

Appendix J      Summary of Complaints