*
Background
Project Organisation
Construction
Works undertaken during the Reporting Month
Summary of
EM&A Requirements
Monitoring Requirements
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Results and
Observations
Monitoring Requirements
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Results and
Observations
Site
Environmental Audit
Review of
Environmental Monitoring Procedures
Status of
Environmental Licensing and Permitting
Implementation
Status of Environmental Mitigation Measures
Implementation
Status of Environmental Complaint Handling Procedures
Audit
Requirement
Audit
Results
Recommendations,
Corrective Actions and Outstanding Issues
Key Issues
for the Coming Month
Environmental
Monitoring Program for the Next Three Months
Construction
Program for the Next Three Months
7.**** CONCLUSIONS AND
RECOMMENDATIONS
Conclusions
Recommendations
List of Tables
Table 1.1* Construction Activities in May 2006
Table 2.1* TSP Monitoring Equipment
Table 2.2* Air Quality Monitoring Parameters and
Frequency
Table 2.3* Locations of Air Quality Monitoring Stations
Table 2.4* Summary of Impact Air Quality Monitoring
Results for May 2006
Table 3.1* Noise Monitoring Equipment
Table 3.2* Noise Monitoring Parameters, Period and
Frequency
Table 3.3* Noise Monitoring Locations
Table 3.4* Summary of Noise Monitoring Results for May
2006
Table 4.1* Summary of Environmental Licensing and Permit
Status
Table 4.2* Estimated Amounts of Waste Generated in May
2006
Table 6.1* Tentative Programme
of Construction Works
List of Figures
Figure 1.1**Project Organisation
Figure 1.2**Layout of Work Site
Figure 2.1**Locations of Air Quality and Noise
Monitoring Stations
Figure 2.2**Location of Meteorological Station
List of Appendices
Appendix
A** Contact of
Key Environmental Personnel
Appendix
B** Action and Limit Level
Appendix
C** Environmental Monitoring Schedule
Appendix
D **Air Quality Monitoring Results
Appendix
E** Summary of Calibration Records
Appendix
F***Noise Monitoring Results
Appendix
G** Summary of Environmental Mitigation
Implementation Schedule
Appendix
H **Event and Action Plan
Appendix
I*** Complaint Flow Diagram and
Complaint Log
Appendix
J***Summary of Complaints