TABLE OF CONTENTS
Background
Project
Organisation
Construction Works
undertaken during the Reporting Month
Summary of EM&A
Requirements
Monitoring
Requirements
Monitoring
Equipment
Monitoring Parameters,
Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Results and
Observations
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Results and
Observations
Site Environmental
Audit
Review of
Environmental Monitoring Procedures
Status of
Environmental Licensing and Permitting
Implementation
Status of Environmental Mitigation Measures
Implementation
Status of Environmental Complaint Handling Procedures
Audit Requirement
Audit Results
Recommendations,
Corrective Actions and Outstanding Issues
Key Issues for the
Coming Month
Environmental
Monitoring Program for the Next Three Months
Construction
Program for the Next Three Months
7.**** CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
List of Tables
Table 1.1***** Construction
Activities in April 2005
Table 2.1***** TSP Monitoring
Equipment
Table 2.2***** Air Quality
Monitoring Parameters and Frequency
Table 2.3***** Locations of Air
Quality Monitoring Stations
Table 2.4***** Summary of
Impact Air Quality Monitoring Results for April 2005
Table 3.1***** Noise Monitoring
Equipment
Table 3.2***** Noise Monitoring
Parameters, Period and Frequency
Table 3.3***** Noise Monitoring
Locations
Table 3.4***** Summary of Noise
Monitoring Results for April 2005
Table 4.1***** Summary of
Environmental Licensing and Permit Status
Table 4.2***** Estimated
Amounts of Waste Generated in April 2005
Table 6.1***** Tentative
Programme of Construction Works
List of Figures
Figure 1.1*****Project
Organisation
Figure 1.2*****Layout
of Work Site
Figure 2.1*****Locations
of Air Quality and Noise Monitoring Stations
Figure 2.2*****Location
of Meteorological Station*****
List of Appendices
Appendix A*** Contact
of Key Environmental Personnel
Appendix B*** Action
and Limit Level
Appendix C*** Environmental
Monitoring Schedule
Appendix D ***Air
Quality Monitoring Results
Appendix E*** Summary
of Calibration Records
Appendix F****Noise
Monitoring Results
Appendix G*** Summary
of Environmental Mitigation Implementation Schedule
Appendix H ***Event
and Action Plan
Appendix I**** Complaint
Flow Diagram and Complaint Log
Appendix J****Summary
of Complaints