COVER

 

TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

1.**** INTRODUCTION

Background

Project Organisation

Construction Works undertaken during the Reporting Month

Summary of EM&A Requirements

2.**** AIR QUALITY MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

3.**** NOISE MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

4.**** ENVIRONMENTAL AUDIT

Site Environmental Audit

Review of Environmental Monitoring Procedures

Status of Environmental Licensing and Permitting

Implementation Status of Environmental Mitigation Measures

Implementation Status of Environmental Complaint Handling Procedures

5.**** LANDSCAPE AND VISUAL

Audit Requirement

Audit Results

Recommendations, Corrective Actions and Outstanding Issues

6.**** FUTURE KEY ISSUES

Key Issues for the Coming Month

Environmental Monitoring Program for the Next Three Months

Construction Program for the Next Three Months

7.**** CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

 

 

List of Tables

 

Table 1.1***** Construction Activities in April 2005

Table 2.1***** TSP Monitoring Equipment

Table 2.2***** Air Quality Monitoring Parameters and Frequency

Table 2.3***** Locations of Air Quality Monitoring Stations

Table 2.4***** Summary of Impact Air Quality Monitoring Results for April 2005

Table 3.1***** Noise Monitoring Equipment

Table 3.2***** Noise Monitoring Parameters, Period and Frequency

Table 3.3***** Noise Monitoring Locations

Table 3.4***** Summary of Noise Monitoring Results for April 2005

Table 4.1***** Summary of Environmental Licensing and Permit Status

Table 4.2***** Estimated Amounts of Waste Generated in April 2005

Table 6.1***** Tentative Programme of Construction Works

 

 

List of Figures

 

Figure 1.1*****Project Organisation

Figure 1.2*****Layout of Work Site

Figure 2.1*****Locations of Air Quality and Noise Monitoring Stations

Figure 2.2*****Location of Meteorological Station*****

 

 

List of Appendices

 

Appendix A*** Contact of Key Environmental Personnel

Appendix B*** Action and Limit Level

Appendix C*** Environmental Monitoring Schedule

Appendix D ***Air Quality Monitoring Results

Appendix E*** Summary of Calibration Records

Appendix F****Noise Monitoring Results

Appendix G*** Summary of Environmental Mitigation Implementation Schedule

Appendix H ***Event and Action Plan

Appendix I**** Complaint Flow Diagram and Complaint Log

Appendix J****Summary of Complaints