Cover

TABLE OF CONTENTS

 

Page

EXECUTIVE SUMMARY

1.***** INTRODUCTION

Background

Project Organisation

Construction Works undertaken during the Reporting Month

Summary of EM&A Requirements

2.**** AIR QUALITY MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

3.**** NOISE MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

4.***** ENVIRONMENTAL AUDIT

Site Environmental Audit

Review of Environmental Monitoring Procedures

Status of Environmental Licensing and Permitting

Implementation Status of Environmental Mitigation Measures

Implementation Status of Environmental Complaint Handling Procedures

5.***** LANDSCAPE AND VISUAL

Audit Requirement

Audit Results

Recommendations, Corrective Actions and Outstanding Issues

6.***** FUTURE KEY ISSUES

Key Issues for the Coming Month

Environmental Monitoring Program for the Next Three Months

Construction Program for the Next Three Months

7.***** CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

 

 

List of Tables

 

Table 1.1****Construction Activities in March 2005

Table 2.1* TSP Monitoring Equipment

Table 2.2* Air Quality Monitoring Parameters and Frequency

Table 2.3****Locations of Air Quality Monitoring Stations

Table 2.4****Summary of Impact Air Quality Monitoring Results for March 2005

Table 3.1****Noise Monitoring Equipment

Table 3.2****Noise Monitoring Parameters, Period and Frequency

Table 3.3****Noise Monitoring Locations

Table 3.4****Summary of Noise Monitoring Results for March 2005

Table 4.1****Summary of Environmental Licensing and Permit Status

Table 4.2****Estimated Amounts of Waste Generated in March 2005

Table 6.1****Tentative Programme of Construction Works

 

 

List of Figures

 

Figure 1.1***Project Organisation

Figure 1.2***Layout of Work Site

Figure 2.1***Locations of Air Quality and Noise Monitoring Stations

Figure 2.2***Location of Meteorological Station*

 

 

List of Appendices

 

Appendix A**** Contact of Key Environmental Personnel

Appendix B**** Action and Limit Level

Appendix C**** Environmental Monitoring Schedule

Appendix D **** Air Quality Monitoring Results

Appendix E**** Summary of Calibration Records

Appendix F**** Noise Monitoring Results

Appendix G**** Summary of Environmental Mitigation Implementation Schedule

Appendix H **** Event and Action Plan

Appendix I **** Complaint Flow Diagram and Complaint Log

Appendix J ****Summary of Complaints