TABLE OF
CONTENTS
Page
Background
Project
Organisation
Construction
Works undertaken during the Reporting Month
Summary of
EM&A Requirements
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Results
and Observations
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Results
and Observations
Site
Environmental Audit
Review of
Environmental Monitoring Procedures
Status of
Environmental Licensing and Permitting
Implementation
Status of Environmental Mitigation Measures
Implementation
Status of Environmental Complaint Handling Procedures
Audit
Requirement
Audit
Results
Recommendations,
Corrective Actions and Outstanding Issues
Key Issues
for the Coming Month
Environmental
Monitoring Program for the Next Three Months
Construction
Program for the Next Three Months
7.***** CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
List of
Tables
Table 1.1****Construction Activities in March
2005
Table 2.1* TSP Monitoring Equipment
Table 2.2* Air Quality Monitoring Parameters
and Frequency
Table 2.3****Locations of Air Quality
Monitoring Stations
Table 2.4****Summary of Impact Air Quality
Monitoring Results for March 2005
Table 3.1****Noise Monitoring Equipment
Table 3.2****Noise Monitoring Parameters,
Period and Frequency
Table 3.3****Noise Monitoring Locations
Table 3.4****Summary of Noise Monitoring
Results for March 2005
Table 4.1****Summary of Environmental Licensing
and Permit Status
Table 4.2****Estimated Amounts of Waste Generated
in March 2005
Table 6.1****Tentative Programme of
Construction Works
List of
Figures
Figure
1.1***Project Organisation
Figure
1.2***Layout of Work Site
Figure
2.1***Locations of Air Quality and Noise Monitoring
Stations
Figure
2.2***Location of Meteorological Station*
List of
Appendices
Appendix A****
Contact of Key Environmental Personnel
Appendix B****
Action and Limit Level
Appendix C****
Environmental Monitoring Schedule
Appendix D ****
Air Quality Monitoring Results
Appendix E****
Summary of Calibration Records
Appendix F****
Noise Monitoring Results
Appendix G****
Summary of Environmental Mitigation Implementation Schedule
Appendix H ****
Event and Action Plan
Appendix I ****
Complaint Flow Diagram and Complaint Log
Appendix J
****Summary of Complaints