COVER

TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

1.**** INTRODUCTION

Background

Project Organisation

Construction Works undertaken during the Reporting Month

Summary of EM&A Requirements

2.**** AIR QUALITY MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

3.**** NOISE MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Results and Observations

4.**** ENVIRONMENTAL AUDIT

Site Environmental Audit

Review of Environmental Monitoring Procedures

Status of Environmental Licensing and Permitting

Implementation Status of Environmental Mitigation Measures

Implementation Status of Event/Action Plans

Implementation Status of Environmental Complaint Handling Procedures

5.**** LANDSCAPE AND VISUAL

Audit Requirement

Audit Results

Recommendations, Corrective Actions and Outstanding Issues

6.**** FUTURE KEY ISSUES

Key Issues for the Coming Month

Environmental Monitoring Program for the Next Three Months

Construction Program for the Next Three Months

7.**** CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

List of Tables

 

Table 1.1*****Construction Activities in March 2004

Table 2.1*****TSP Monitoring Equipment

Table 2.2*****Air Quality Monitoring Parameters and Frequency

Table 2.3*****Locations of Air Quality Monitoring Stations

Table 2.4*****Summary of Impact Air Quality Monitoring Results for March 2004

Table 3.1*****Noise Monitoring Equipment

Table 3.2*****Noise Monitoring Parameters, Period and Frequency

Table 3.3*****Noise Monitoring Locations

Table 3.4*****Summary of Noise Monitoring Results for March 2004

Table 4.1*****Summary of Environmental Licensing and Permit Status

Table 4.2*****Estimated Amounts of Waste Generated in March 2004

Table 6.1*****Tentative Programme of Construction Works

 

List of Figures

 

Figure 1.1**** Project Organisation

Figure 1.2**** Layout of Work Site

Figure 2.1**** Locations of Air Quality and Noise Monitoring Stations

Figure 2.2**** Location of Meteorological Station****

 

List of Appendices

 

Appendix A*****Contact of Key Environmental Personnel

Appendix B*****Action and Limit Level

Appendix C*****Environmental Monitoring Schedule

Appendix D **** Air Quality Monitoring Results

Appendix E*****Meteorological Data

Appendix F*****Certificate of Calibration

Appendix G*****Noise Monitoring Results

Appendix H*****Summary of Environmental Mitigation Implementation Schedule

Appendix I *****Event and Action Plan

Appendix J***** Complaint Flow Diagram and Complaint Log