TABLE OF CONTENTS
Background
Project Organisation
Construction Works undertaken during the Reporting Month
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Locations
Monitoring Methodology
Results and Observations
Monitoring Requirements
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Locations
Monitoring Methodology
Results and Observations
Site Environmental Audit
Review of Environmental Monitoring Procedures
Status of Environmental Licensing and Permitting
Implementation Status of Environmental Mitigation Measures
Implementation Status of Event/Action Plans
Implementation Status of Environmental Complaint Handling
Procedures
Audit Requirement
Audit Results
Recommendations, Corrective Actions and Outstanding Issues
Key Issues for the Coming Month
Environmental Monitoring Program for the Next Three Months
Construction Program for the Next Three Months
7.**** CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
List of Tables
Table
1.1*****Construction Activities in March
2004
Table
2.1*****TSP Monitoring Equipment
Table
2.2*****Air Quality Monitoring Parameters
and Frequency
Table
2.3*****Locations of Air Quality Monitoring
Stations
Table
2.4*****Summary of Impact Air Quality Monitoring
Results for March 2004
Table
3.1*****Noise Monitoring Equipment
Table
3.2*****Noise Monitoring Parameters, Period
and Frequency
Table
3.3*****Noise Monitoring Locations
Table
3.4*****Summary of Noise Monitoring Results
for March 2004
Table
4.1*****Summary of Environmental Licensing
and Permit Status
Table
4.2*****Estimated Amounts of Waste Generated
in March 2004
Table
6.1*****Tentative Programme of Construction
Works
List of Figures
Figure
1.1**** Project Organisation
Figure
1.2**** Layout of Work Site
Figure
2.1**** Locations of Air Quality
and Noise Monitoring Stations
Figure
2.2**** Location of Meteorological
Station****
List of Appendices
Appendix
A*****Contact of Key Environmental
Personnel
Appendix
B*****Action and Limit Level
Appendix
C*****Environmental Monitoring Schedule
Appendix
D **** Air Quality Monitoring Results
Appendix
E*****Meteorological Data
Appendix
F*****Certificate of Calibration
Appendix
G*****Noise Monitoring Results
Appendix
H*****Summary of Environmental Mitigation
Implementation Schedule
Appendix
I *****Event and Action Plan
Appendix
J***** Complaint Flow Diagram and
Complaint Log