Widening and realignment of a 3.6 km section of Tung Chung Road
between Lung Tseng Tau and Pak Kung Au from a single-lane road for two-way traffic
to a single two-lane road for two-way traffic with a footpath having a minimum width of 1.6 m;
Construction of a 2.6 km long single two-lane road between Pak Kung Au and
Cheung Sha, including elevated highway structures of a total length of 750 m,
with a footpath of a minimum width of 1.6 m;
Provision of 21 passing bays/bus-bays along the road and a roundabout at Cheung Sha;
Associated works including road rehabilitation, drainage, utility, environmental mitigation
measures, landscaping, slope stabilisation, traffic aids, road safety
enhancement measures, lighting, traffic control and surveillance system, and
electrical and mechanical (E&M) works.
¡@
|