| Ngong Shuen Chau Viaduct (NSCV) is an integral part of Route 8 between Tsing Yi and Cheung Sha Wan. NSCV comprises a 2.2 km dual 3-lane carriageway connecting the proposed Stonecutters Bridge with West Kowloon Highway and that section of Route 8 between Cheung Sha Wan and Sha Tin at Lai Wan Interchange in Cheung Sha Wan | ![]() |
| StoneCutter Bridge is a 1.6 km high level bridge, with a centre span of 1,018 m, crossing Rambler Channel | ![]() |
| East Tsing Yi Viaduct is a 1.1 km road connecting the eastern portal of Nam Wan Tunnel with Stonecutters Bridge | ![]() |
| Nam Wan Tunnel is a 1.2 km dual 3-lane twin tube tunnel at the southern part of Tsing Yi Island from Sai Tso Wan to Nam Wan Kok with associated tunnel portal buildings. | ![]() |
| 荔枝角高架路是八号干线长沙湾至蝴蝶谷段的其中一个主要部份。荔枝角高架路长一点四公里,为一双程分隔车道,而每边车道均有三条行车线,接通荔枝角交汇处拟建之昂船洲高架路,再跨越卫民村伸延至位于蝴蝶谷的八号干线尖山隧道。此高架路亦包括连接在荔湾交汇处,呈祥道及蝴蝶谷交汇处道路网的支路。 |
![]() |
尖山隧道是八号干线长沙湾至沙田段的其中一个主要部份。工程包括建造尖山隧道,隧道入口大楼及行政大楼,道路及渠务工程,以及尖山隧道、沙田岭隧道和T3号道路的电子及机械工程。
|
![]() |
沙田岭隧道及引道 (工程委托土木工程拓展署处理) |