| Ngong Shuen Chau Viaduct (NSCV) is an integral part of Route 8 between Tsing Yi and Cheung Sha Wan. NSCV comprises a 2.2 km dual 3-lane carriageway connecting the proposed Stonecutters Bridge with West Kowloon Highway and that section of Route 8 between Cheung Sha Wan and Sha Tin at Lai Wan Interchange in Cheung Sha Wan | ![]() |
| StoneCutter Bridge is a 1.6 km high level bridge, with a centre span of 1,018 m, crossing Rambler Channel | ![]() |
| East Tsing Yi Viaduct is a 1.1 km road connecting the eastern portal of Nam Wan Tunnel with Stonecutters Bridge | ![]() |
| Nam Wan Tunnel is a 1.2 km dual 3-lane twin tube tunnel at the southern part of Tsing Yi Island from Sai Tso Wan to Nam Wan Kok with associated tunnel portal buildings. | ![]() |
| 荔枝角高架路是八號幹線長沙灣至蝴蝶谷段的其中一個主要部份。荔枝角高架路長一點四公里,為一雙程分隔車道,而每邊車道均有三條行車線,接通荔枝角交匯處擬建之昂船洲高架路,再跨越衛民村伸延至位於蝴蝶谷的八號幹線尖山隧道。此高架路亦包括連接在荔灣交匯處,呈祥道及蝴蝶谷交匯處道路網的支路。 |
![]() |
尖山隧道是八號幹線長沙灣至沙田段的其中一個主要部份。工程包括建造尖山隧道,隧道入口大樓及行政大樓,道路及渠務工程,以及尖山隧道、沙田嶺隧道和T3號道路的電子及機械工程。
|
![]() |
沙田嶺隧道及引道 (工程委托土木工程拓展署處理) |