Excavation Permit Processing Manual

No.
Utility Technical Liaison Committee Papers (UTLC Papers)
File Type
1/98 Excavation Permit Applications that Do Not Satisfy the Lead Time Requirement for Registration Pdf Format
2/98 Maximum Advance Time for Excavation Permit Application Pdf Format
1/99 Self-adhesive Temporary Road Marking Tapes Pdf Format
2/2000 Location of Manhole Covers in Carriageway Pdf Format
3/2000 Manhole Covers on Precast Paving Blocks/Slabs or Tiles Pdf Format
4/2001 Guidelines on Tactile Warning Strips at Manhole Covers Pdf Format
4/2002 Time Taken for Receiving Feedback from Utility Undertakers on Street Furniture Works Pdf Format

3/2003
(Rev. 4)

(Supplement of UTLC Paper 3/2000) – Collection of Paving Blocks & Construction of Recessed Covers Pdf Format
1/2004
(Rev. B)
Calculation of Percentage Compliance with the 2-day Advance Notification (AN) Requirement Pdf Format
1/2005 Recessed Kerbline Pdf Format
2/2005

Action to be Taken for Shallow-depth Services Identified during Audit Inspection
(Superseded by UTLC Paper 1/2012)

-
1/2008 WSD Special Site Arrangement Noncompliance in the Provision of 1.5m Minimum Passage Width in Execution of Water Main Laying Works in Back Lanes Pdf Format
2/2009 Definition of Unattended Site and Review of Standard Reasons Pdf Format
4/2009 Tighten up Monitoring and Control on Use of Display Board at Idling Site Pdf Format
5/2009 Trial on Instant Notification to Utility Undertakings (UUs) on Non-compliance (NC) Items for Immediate Rectification Pdf Format
2/2010 Enhancement on Aesthetics of Temporary Reinstatement of Footpaths Pdf Format
3/2010 Monitoring and Control on UUs’ Prolonged Delay in Taking Responding and Rectification Actions on Rejected Permanent Reinstatement Works Pdf Format
1/2012 Strengthening Measures in Audit Inspection to Control Non-compliance (NC) with Minimum Depth Requirements and Requirements of Photographs to be Submitted for Processing Completion Notice (CN) Pdf Format