Major Projects

Reconstruction and Improvement of Tuen Mun Road – Sam Shing Hui Section

(updated as at 31.3.2012)

Contract Title :

HY/2008/11 – Reconstruction and Improvement of Tuen Mun Road – Sam Shing Hui Section

Consultant :

AECOM Asia Company Limited
(Formerly known as Maunsell Consultants Asia Ltd.)

Contractor :

China Harbour Engineering Company Limited

Construction Commencement Date :

30 June 2009

Commissioning Date :

End 2014

Contract Sum ($Million) :

1366

Description :

The Contract ”Reconstruction and Improvement of Tuen Mun Road – Sam Shing Hui Section” comprises 4.7km dual 3-lane carriageway from Siu Lam to Sam Shing Hui.

The scope of the contract mainly includes:

  1. reconstruction and re-alignment of Tuen Mun Road between Siu Lam and Sam Shing Hui to current expressway standard;
  2. widening of traffic lanes to expressway standard width and provision of hard shoulders and verges along Tuen Mun Road;
  3. widening of highways structures including vehicular bridges, box culverts and subways;
  4. replacement of the existing road restraint system with new types of parapets and roadside barriers;
  5. reconstruction of road pavements;
  6. installation of noise enclosure; and
  7. ancillary works including slope, drainage, landscaping, utility works; installation of traffic control and surveillance and fire fighting systems; modification of directional signs to current expressway standard; and provision of catchwater decking and natural terrain hazard mitigation measures.

For more information, please visit Contract Web Site.