Reconstruction and Improvement of Tuen Mun Road – Eastern Section
(updated as at 31.3.2012)
Contract Title :
HY/2007/09 – Reconstruction and Improvement of Tuen Mun Road – Eastern Section
Consultant :
AECOM Asia Company Limited
(Formerly known as Maunsell Consultants Asia Ltd.)
Contractor :
Gammon Construction Limited
Construction Commencement Date :
30 October 2008
Commissioning Date :
End 2014
Contract Sum ($Million) :
2822
Description :
The Contract ”Reconstruction and Improvement of Tuen Mun Road – Eastern Section” comprises 6.85km dual 3-lane carriageway from Tsuen Wan to Tsing Lung Tau
The scope of the contract mainly includes:
- reconstruction and re-alignment of Tuen Mun Road between Tsuen Wan and Tsing Lung Tau to current expressway standard;
- widening of traffic lanes to expressway standard width and provision of hard shoulders and verges along Tuen Mun Road;
- widening of highways structures including vehicular bridges, box culverts and underpasses;
- re-provision and modification of the existing footbridges;
- improvement of the merging / diverging arrangement at Sham Tseng Interchange and Tsing Long Highway’s exit ramp onto westbound of Tuen Mun Road;
- replacement of the existing road restraint system with new types of parapets and roadside barriers;
- reconstruction of at-grade pavements;
- installation of cantilever/vertical noise barriers and semi enclosures on Tuen Mun Road at Tsuen Wan, Yau Kom Tau, Sham Tseng and Anglers’ Beach;
- ancillary works including slope, drainage, landscaping, water and utility works; installation of traffic control and surveillance and fire fighting systems; modification of direction signs to current expressway standard; and provision of catchwater decking and the related debris flow mitigation measures.