Improvements to San Tin Interchange
Contract title:
HY/2004/09 – Improvements to San Tin Interchange
Main Contractor:
Chun Wo Construction & Engineering Co.Ltd.
Construction Commencement Date:
28 April 2005
Commissioning Date:
May 2007
Contract Sum($M):
348.0
Description :
The Project includes :
- construction of a single two-lane road of 1.5-kilometre in length for the westbound traffic from Fanling Highway (FH) to the vehicle holding area (VHA) in Lok Ma Chau including 800 m of elevated highway structures;
- construction of a single two-lane road of 850 m in length for the eastbound traffic from San Tin Highway (STH) to the VHA in Lok Ma Chau including 450 m of elevated highway structures;
- construction of a single two-lane road of 50 m in length connecting Kwu Tung Road (KTR) to the road mentioned in paragraph (a) above;
- construction of a single two-lane road of about 250 m between Castle Peak Road (CPR) and San Sham Road (SSR);
- modification of the junction of STH / CPR / Tun Yu Road (TYR) including signalisation of the junction of CPR and slip roads from STH, and widening of a 300-m section of CPR from a single two-lane to a dual two-lane road;
- construction of a single-lane road bridge of 70 m in length across the San Tin Eastern Main Drainage Channel (STEMDC) connecting an existing unnamed road along the eastern side of STEMDC near the VHA and TYR;
- installation of noise barriers 120 m in length and 1.5 m in high at STH near Wing Ping Tsuen;
- provision of a traffic control and surveillance system (TCSS); and
- associated works on junction improvements, landscaping, slopeworks, drainage, traffic management measures and street lighting.