Central – Wan Chai Bypass – Tunnel (Causeway Bay Typhoon Shelter Section)
(updated as at 31.3.2012)
Contract Title :
HY/2009/15 – Central – Wan Chai Bypass – Tunnel (Causeway Bay Typhoon Shelter Section)
Consultant :
AECOM Asia Company Limited
(Formerly known as Maunsell Consultants Asia Ltd.)
Contractor :
China State Construction Engineering (HK) Limited
Construction Commencement Date :
27 September 2010
Completion Date :
First quarter of 2016
Contract Sum ($Million) :
5,377
Description :
The scope of the Contract mainly includes:
- Construction of tunnel structure in the ex-Wan Chai Public Cargo Working Area (ex-PCWA) and Causeway Bay Typhoon Shelter (CBTS) including the associated temporary reclamation and the subsequent removal of the temporary reclamation after completion of tunnel structure;
- Construction of mined tunnel beneath existing Cross Harbour Tunnel;
- Rearrangement of moorings within CBTS;
- Construction of foundations for the East Ventilation Shaft, together with the East Ventilation Adit along the Eastern Breakwater of CBTS; and
- Associated drainage and sewerage works.