Picture
Major Projects

Central – Wan Chai Bypass – Tunnel (Causeway Bay Typhoon Shelter Section)

(updated as at 31.3.2012)

Contract Title :

HY/2009/15 – Central – Wan Chai Bypass – Tunnel (Causeway Bay Typhoon Shelter Section)

Consultant :

AECOM Asia Company Limited
(Formerly known as Maunsell Consultants Asia Ltd.)

Contractor :

China State Construction Engineering (HK) Limited

Construction Commencement Date :

27 September 2010

Completion Date :

First quarter of 2016

Contract Sum ($Million) :

5,377

Description :

The scope of the Contract mainly includes:

  1. Construction of tunnel structure in the ex-Wan Chai Public Cargo Working Area (ex-PCWA) and Causeway Bay Typhoon Shelter (CBTS) including the associated temporary reclamation and the subsequent removal of the temporary reclamation after completion of tunnel structure;
  2. Construction of mined tunnel beneath existing Cross Harbour Tunnel;
  3. Rearrangement of moorings within CBTS;
  4. Construction of foundations for the East Ventilation Shaft, together with the East Ventilation Adit along the Eastern Breakwater of CBTS; and
  5. Associated drainage and sewerage works.

For more information, please visit Contract Web Site.